BREAKING NEWS
 

Getting ready to power up to 200,000 homes from plant near Brigg

Trusted article source icon
Wednesday, September 26, 2012
Profile image for Scunthorpe Telegraph

Scunthorpe Telegraph

Centrica is well advanced with plans to build a biomass fuelled power station near Brigg which will eventually generate enough electricity to supply up to 200,000 homes.

Public consultation is still ongoing about the project earmarked for a site next to the firm's existing gas-fired power station adjoining the New River Ancholme, on part of the former Brigg sugar factory site which closed in the 1990s. The new plant, which will create 50 full-time jobs when operational, will generate up to 137mw of electricity – enough to supply up to 200,000 homes or an area four times the size of Scunthorpe.

  1. scawbybrookCENTRICA

    How the site at Scawby Brook will look if the second power station goes ahead

The Brigg project helps highlight the growing necessity for new electricity generation with existing capacity expected to fall from 2015 as older power stations are closed.

"Sustainable source" wood pellets will be shipped in, with Baltic states and America the likely providers.

ARE YOU DECORATING? WE HAVE UP TO 30% OFF ON SELECTED BLINDS POP...

Grimsby Sunblinds

View details

30% off on our collection range and other selected fabrics. alternatively call 809887 and we will bring our samples to you for our friendly hassle free quote.

Contact: 01472 809887

Valid until: Saturday, July 13 2013

The biomass fuelled station will stand on land adjacent to the existing Glanford Brigg gas fired power station which is owned by Centrica.

It is expected that biomass is most likely to be transferred from ship to rail at Immingham.

Trains 500 metres in length, made up of container wagons, will then be hauled through Ulceby, Barnetby and Brigg to the site visible from Hibaldstow level crossing.

The wagons will then be taken into a specially built railhead to be unloaded before returning empty to Immingham.

A public consultation exercise on the project continues with an exhibition at Ancholme Leisure Centre, Brigg, on Friday, October 5, from 3pm to 9pm, and Saturday, October 6 in the Angel Suite, Exchange Place, Brigg, from 10am to 4pm. A supplier day for local businesses is to be held on Friday, October 12, between 9am and 1pm, at Forest Pines Hotel.

0
Tweet this article
Report

Your comments awaiting moderation

Be the first to comment

max 4000 characters
 
 
 
 
 

Related articles

 

Tell us about your area

Got some interesting news? Write about it and let your whole community know.

  Write an article